- Home
- Stallion Power Air and Electrical Components
- Stallion Power Truck Electrical Coiled Cable ABS Duty - Long Leads
Stallion Power Truck Electrical Coiled Cable ABS Duty - Long Leads
- SKU:
- 241540CL
- UPC:
- MPN:
- Weight:
- 3.00 LBS
- Shipping:
- Calculated at Checkout
MSRP:
Now:
$77.20
Was:
— You save
Description
Truck Anti-Skid Brake Cable Assemblies with Long Leads - Choose Either 40" or 72" Leads
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with sure fitting "D" contacts. The plugs are corrosion proof and are tougher than metal plugs. Temperature range is -70 F to +400 F. The Philaprene jacket construction provides a tight coil memory, maximum abrasion resistance and maximum reliability. Conductors performance 4/12, 2/10, & 1/8.
Application: to couple electrical power to tractor lighting between tractor and trailer.
Made in the USA!
Benefits & Features
- Stallion Power Electrical Coiled Cables Anatomy
- Sag Proof Memory
- Maximum Performance at -70F to +400F
- No Damage When Dragged or Tossed
- Not Effected By Road Salt or Chemicals
- Patented Socket Locking Grip Prevents Accidental Disconnect From a Pull Force of up to 420 lbs
- Resistant to Driver's Abuse
- No Wear and Tear to Sockets
- Sure Fitting "D" Contacts
- Chamfer Cable Guard
- 3 Years Warranty
Related Products

Stallion Power Truck Electrical Coiled Cable Standard Lite Duty
MSRP:
Now:
$59.05 - $79.85
Was:
Truck Cable Assemblies Standard Lite Duty
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with tight fitting "D"...

Combo or Single 40 in. Lead Stallion Power Air Lines - Coiled Air Brake Component
MSRP:
Now:
$53.10
Was:
--- This is for the Combo or Single Coiled Air Lines With 40 in. Leads---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the...

Alaskan Stallion™ Combo or Single 40 in. Lead Stallion Power Air Lines Coiled Air Brake Components
MSRP:
Now:
$60.57
Was:
--- THIS IS FOR THE COMBO OR INDIVIDUAL RED/BLUE OF THE ALASKAN STALLION™ AIR LINES ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION&trade

Stallion Power Truck Electrical Coiled Cable ABS Duty
MSRP:
Now:
$88.36 - $95.56
Was:
Truck Anti-Skid Brake Cable Assemblies
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with sure fitting "D"...

Stallion Set ABS 7 Way Cable & Air Lines with 40" Lead
MSRP:
Now:
$173.09
Was:
Stallion Set Red & Blue 15’ working length with 40” lead Air Lines combined with 15’ working length with 40” lead ABS 7 Way Cable.
• NO POGO STICK NEEDED• Superior Coil Memory – No Sag and...
Customers Also Viewed

Stallion Power Truck Electrical Coiled Cable ABS Duty
MSRP:
Now:
$88.36 - $95.56
Was:
Truck Anti-Skid Brake Cable Assemblies
Heavy Duty in service, but lightness in weight eliminates wear and tear to electrical sockets!
Virtually INDESTRUCTIBLE Xenoy® plugs with sure fitting "D"...

Alaskan Stallion™ Combo or Single 40 in. Lead Stallion Power Air Lines Coiled Air Brake Components
MSRP:
Now:
$60.57
Was:
--- THIS IS FOR THE COMBO OR INDIVIDUAL RED/BLUE OF THE ALASKAN STALLION™ AIR LINES ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN...

Alaskan Stallion™ Red Power Air Lines Coiled Air Brake Component
MSRP:
Now:
$48.51 - $62.00
Was:
--- THIS IS FOR THE INDIVIDUAL RED ALASKAN STALLION™ AIR LINE ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION™... The Only...

Alaskan Stallion™ Combo Red/Blue Power Air Lines Coiled Air Brake Components
MSRP:
Now:
$94.57 - $101.94
Was:
--- THIS IS FOR THE COMBO RED/BLUE SET OF THE ALASKAN STALLION™ AIR LINES ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION™.....

Alaskan Stallion™ Blue Power Air Lines Coiled Air Brake Component
MSRP:
Now:
$48.51 - $62.71
Was:
--- THIS IS FOR THE INDIVIDUAL BLUE ALASKAN STALLION™ AIR LINE ---
General information on the Alaskan Stallion™ air lines is below
ALASKAN STALLION™... The Only...


Triple Outlet Power Cord
Flexy
MSRP:
Now:
$36.65
Was:
Flexy® Coiled Triple Outlet Compact Power Cord. 16/3 Medium Power 13 Amps 125 Volts 1625 Watts - Stretches from 5 inches to 10 Feet!
Safer - Safely stays out of the way while using cutting...


Flexy® Coiled Extension Cord Extends 10 in. to 20 ft. - 16 Gauge - 13 Amps
MSRP:
Now:
$49.95
Was:
Made in the USA! Flexy® Extension Cord is the perfect and UNIQUE gift; not available or found anywhere else.Perfect Holiday Gift idea for the person or family on your list that has everything. A...


Flexy® Coiled Extension Cord Extends 5 in. to 10 ft. - 16 Gauge - 13 Amps
MSRP:
Now:
$34.18
Was:
Made in the USA! Flexy® Extension Cord is the perfect and UNIQUE gift; not available or found anywhere else.Perfect Holiday Gift idea for the person or family on your list that has everything. A...

Combo or Single 40 in. Lead Stallion Power Air Lines - Coiled Air Brake Component
MSRP:
Now:
$53.10
Was:
--- This is for the Combo or Single Coiled Air Lines With 40 in. Leads---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the...

Combo Red/Blue Stallion Power Air Line - Coiled Air Brake Component
MSRP:
Now:
$84.36
Was:
--- This is For The Combo Red/Blue Coiled Air Lines ---
General information on our air lines is below.
Stallion Power Air Lines- Coiled Air Brake Components
The Best in the industry...THE ONLY AIR...